Choosing Low-Carbon Materials at the Design Stage: How Architects Decide Before Certified LCA Assessment
Most embodied-carbon decisions get locked in during design, yet certified LCA assessment often arrives once the project is nearly fixed. Here is how architects compare material strategies before that point — with Elementa as a concrete example.
